Skip to product information
1 of 30

UniqueBud

SKU:642200027A

006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope

006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope

Regular price Rs. 780.00
Sale price Rs. 780.00 Regular price
Save Rs. -780.00 Sold out
Tax included.

  • Made of durable nylon material with a 360° rotating black heavy-duty clip and soft padding
  • Very suitable for large, medium and small dogs
  • This dog training leash and collar set is made of strong climbing rope and a durable 360-degree non-tangled rust-proof rotating hook, which is stronger than other standard dog leashes and collars
  • With heavy metal buckles, when your dog suddenly tries to run, it can firmly grasp the collar or seat belt
  • Reflective stripes with highly reflective light can help you and your dog stay safe at night
  • Size: 120cm

Package included:

  • 1 x Dog Training Leash

  • Other things not included

  • Made of durable nylon material with a 360° rotating black heavy-duty clip and soft padding
  • Very suitable for large, medium and small dogs
  • This dog training leash and collar set is made of strong climbing rope and a durable 360-degree non-tangled rust-proof rotating hook, which is stronger than other standard dog leashes and collars
  • With heavy metal buckles, when your dog suddenly tries to run, it can firmly grasp the collar or seat belt
  • Reflective stripes with highly reflective light can help you and your dog stay safe at night
  • Size: 120cm

Package included:

  • 1 x Dog Training Leash

  • Other things not included